Description
Large-property storage. The buying argument here is cost per gallon and fewer deliveries, not convenience.
Specified for estates, farms, workshops and hospitality sites with a genuinely commercial gas demand.
Filled to the 80% limit this vessel holds about 800 gallons of propane — roughly 73 million BTU, or about 3,392 lb of product. Against a steady 100,000 BTU/hr load that is roughly 30 days of continuous running before it needs refilling.
Against the 500 gallon it buys real headroom; against the 1,150 it saves footprint and pad. That trade-off is usually decided by the site, not the load.
Specifications
- Total capacity: 1,000 gallons
- Working volume (80% fill): approximately 800 gallons
- Weight of propane when filled: approximately 3,392 lb
- Energy content when full: approximately 73 million BTU
- Installation: Above ground
- Certification: ASME stamped
- Condition: Confirmed on your invoice
- Fuel: Propane / LPG
Siting notes
Surface installation keeps the whole vessel inspectable. Coating faults, valve seepage and gauge problems are all visible before they become expensive, which is the main argument for staying above ground where the site allows it.
Installation is a licensed trade. We will get the vessel to your site on an insured carrier; setting, connecting and commissioning it is work for a qualified propane contractor.
Condition and certification
Every vessel is stamp-verified and pressure tested before dispatch, and the data plate photograph and test record travel with the invoice.
Valves and fittings are inspected as a set. A vessel goes out with a working gauge and a relief valve in date, or it does not go out.
The economics
The economics of propane are mostly delivery economics. Storage that lets you take a full load when prices are low pays for itself faster than most owners expect.
Before you order
Size against the real load, not the optimistic one. A vessel one size too small costs more across ten years of refills than the larger one did on the day you bought it.
Ask what the regulator and first-stage arrangement will be. The tank is only half the specification, and the wrong regulator will starve appliances the vessel could easily supply.